Fort Walton Beach’s $673,222 Storm-Drain Entry Has an Offsetting Adjustment
A construction account and a capital-outlay reclassification show why a spreadsheet total needs context.


The fiscal 2025 storm-drain improvement account records $673,222.11. Elsewhere in the same Stormwater Fund, “RECLASSIFY CAPITAL OUTLAY” records the exact negative amount. Both are in the Fort Walton Beach CSV. [1]
Fort Walton Beach Records Show Nearly $2 Million in General Fund Transfers
Fort Walton Beach Landfill-Fee Entries Total $1.56 Million
Two lines, two accounting jobs
Account 405-5019-538.63-58 is labeled “IMPROV OTHER THAN BLDG / STORM DRAINS.” It carries a $548,978 budget field and $673,222.11 actual field—a $124,244.11 difference. Account 405-9000-590.99-00 records minus $673,222.11 as capital-outlay reclassification. [1]
Those two actual figures sum to zero. That arithmetic does not mean no construction occurred, that a vendor refunded the money, or that the city paid nothing. A negative reclassification is not automatically a cash receipt.
What the export can—and cannot—answer
The matching amounts are consistent with moving a capital amount out of an expense presentation, but the spreadsheet alone does not explain the journal entry or identify the resulting asset. The account label is a lead for checking that treatment, not a substitute for the supporting ledger.
The export does not identify the drainage locations, contractors, quantities installed or completion status attached to this account. Nor does its budget comparison establish whether a later authorization covered the difference.
From an account code to a project
A useful records request would ask for the project ledger behind the storm-drain account, contracts and pay applications charged to it, budget amendments, and the journal-entry support for the equal reclassification.
Those records would connect the financial entry to actual infrastructure: which drains, which work, which approvals and which payments. The paired entries make that search more precise.
How to check the numbers
The export is attributable to Fort Walton Beach: its FWB365 and local project labels align with city records, and its fiscal 2025 police professional-services account matches the official budget’s account code and $464,809 amount. This corroborates the city identification; it does not independently audit every figure. [2][3]
This article uses fiscal 2025 entries in the archived CSV, not a live account balance or a claim that these figures are audited final results. The file also includes 2026, but its extraction date and year-end status are not supplied.
Source accounts: 405-5019-538.63-58 (CSV row 68,284); 405-9000-590.99-00 (CSV row 68,616). [1]
Sources & archive records
- Budget to Actual, All Funds, 2014–2026 — archived original CSV
Analysis of the owner-supplied Budget-to-Actual-ALL-Funds-2014-2026.csv. Values are accounting entries as exported; the file does not identify its extraction date or audit status. CSV row numbers count the header as row 1.
- City of Fort Walton Beach — Budget Book 2025
Corroborates city identity through matching account 001-0800-521.31-00 and $464,809 budget; used for attribution, not as independent verification of actual amounts.
- City of Fort Walton Beach — Project Dashboard
Corroborates local project and program names, including FWB365, Ferry Park and Brooks Bridge.



